The RES4BUILD project has several case studies based in the Netherlands and Poland. THese case studies are part of Work Package 4 Co-design of integrated energy systems led by JIN Climate and Sustainability. Their work will:
- Pilot a co-design process for developing IES in buildings.
- Engage end users from real buildings.
- Introduce their needs in the IES design process.
- Initiate the set-up of regional ‘building upgrading teams’ with local market actors.

For more information on the case studies and the ongoing work, see: https://res4build.eu/about/case-studies/